Details





One of the creeks which carved Ulugecit Pass over the centuries.




Double track tunnel in Ulugecit Pass. Note the catenary inside the tunnel. I installed catenary in such places with the idea that I may install catenary throughout the layout in the future with minimum disruption and damage to the scenery.




Code 100 track was used in the construction of the trackwork. Peco switches were used with under-floor solenoid switch machines. Note inspection pit to the left.

 




Tunnel No.1 west of Sazlidere.




Trackwork at Kemalpasa-west.

 




Trackwork on the west end of Kemalpasa.